This entry combines several small work sessions where I installed the remaining ribs one or two at a time. The process was, of course, the same as the first 3 ribs that I documented.
Installed the end ribs, riveted on the reinforcement plates.
Measured, cut, bent, and flared the tubing for the tank vent line. Installed the vent line.
All of the tank ribs are riveted on
Vent line attached to inboard rib
I bent the end up slightly to get it in as high a point in the tank as possible