Powered By Kitlog Pro v2.0
Tod's T-51 Project
T-51D Mustang
All
5-10-2014
< Previous Log Entry
Next Log Entry >
Date:
5-10-2014
Number of Hours:
5.00
Manual Reference:
Brief Description:
Added tail section to fuselage
Schotch padded the entire empennage, leveled the frame and the clamped the verticle stablizer and plummed it up. Once it was plum, we drilled and clecoed it in place. We then aligned the horizontal stablizer in place, drilled and clecoed them.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
T-51D Mustang Home
Category
# Logs
# Hours
All
540
2714
Avionics
26
206
Brakes and Wheels
3
10
Center Section
86
328
Cockpit
10
37
Cowling
48
208
Electrical
65
317
Empennage
20
348
Engine
57
248
Fiberglass
24
105
Fuel System
12
53
Fuselage
30
146
Landing Gear
76
352
Miscellaneous
18
62
None
1
Paint
8
33
Prop
1
2
Wings
55
259
Copyright © 2001-2024 Matronics. All Rights Reserved.