Finished the lexan baggage access door and then worked on the fiberglass belly. Re-drilled all the #30 holes in the belly and preped it for installing it on the frame. Added 3M glue to all the flanges that hold the belly on. Safety wired the clamps to the radiator. Cody and I placed the belly shell and clecoed in place and then started riveting the belly to the bulk heads. All the holes that get attached to the aluminum skins we left the clecoes in place.