KitLog pro

Powered By Kitlog Pro v2.0

Tims Lightning XS
' style=
Date:  10-2-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Body work

Flipped plane over to body work the belly. Did this by standing plane on its nose, rotating 180 degrees and lowering tail onto sawhorse.

Removed 1/4" of lower HS TE for better down elevator clearance.

Removed FG tip plugs from mold. My paper must not have had enough wax, because the FG did stick to the paper. Glad I used 2 layers of paper between the two layups.

Glassed bottom of HS/VS intersection.

BW wing LEs and light pockets - again.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.