Powered By Kitlog Pro v2.0
TERRY'S WEB SITE
RV 10
Fuselage
9-14-2015
< Previous Log Entry
Next Log Entry >
Date:
9-14-2015
Number of Hours:
4.50
Manual Reference:
Brief Description:
Cabin Fairing
Rough sanded some in both door jambs and prepped the right side fuselage around the door area. Once prepped and alodined, I added a 1/8" layer of epoxy/micro. So far, most of the epoxy/micro has been removed by sanding.
Right threshold prep
Left threshold sanded
Right threshold epoxy
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 10 Home
Category
# Logs
# Hours
All
643
3955
Avionics
73
463
Empennage
22
130
Engine
64
380
Final Assembly
37
228
Fuselage
344
2131
Milestones
6
11
Miscellaneous
4
12
None
6
11
Prop
8
46
Tools
1
1
Wings
78
542
Copyright © 2001-2024 Matronics. All Rights Reserved.