Cleaned up the wheel fairings today and drilled, chamfered and added 7 nut plates to the aft shell on both sides. Then all was installed on the fuselage and checked for straight and level. I am happy with the results. Then I started on the leg fairings. After cutting them to fit, I temporally placed them and did a initial check. They are going to look nice I think. I placed a small tick mark on each of the two fairings to help me locate the center making it much easier to install/position.