Before I close out the cargo bay right outboard wall, I wanted to add a bracket with two bushings to secure my static line and my RG400 NAV1 coax coming from the tail section. I plan to add the bracket and run the wires and insulate just before the panel is installed because it is riveted in place. I then vacuumed and riveted the cargo bay floor down. Once it was down, I added the cargo bay door jam. I had enough time to partially install the empennage bulkhead panel.