Brief Description: Forward floor pans and lower gear installed
Today I blind riveted the L/R forward floor pans. Because I set the gear in place before I riveted, there were two rivets I could not get to with blind rivets, so I used AN470AD4-4 instead. They were actually easy to get to with the rivet gun and bucking bar. When I finished the forward floor, I installed both the L/R lower gear. The bolts were rather difficult to get to, but in the end all bolts were installed, torqued and marked with torque seal. To end the day, I installed the two remaining forward ribs that were left out so the pan could be installed. The rear steps are next.