Finished up the right side baffling and started on the right air ramp. Kris held the workbench down while I bent the pieces to the specified angle. I used a protractor the set the angle and validated it when I connected them to their mating bracket. I finished the preliminary work (easy part) of the air ramps and alumipreped and alodined all parts. They will dry overnight and I will assemble them tomorrow.