KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  2-15-2013
Number of Hours:  8.00
Manual Reference:  Section 17
Brief Description:  Right leading edge

Started assembly of the right leading edge this morning. All went together very well. After all was clecoed, I started riveting the ribs starting with the two most aft located rivets on each rib. I was able to squeeze the first three rivets on each rib and bucked the rest. Because I need assistance holding the leading edge in place, I set the leading edge aside for installation on Monday. Fuel tanks are next.
' style=

Right leading edge J channel being installed

Right leading edge J channel being installed

' style=

Almost reassembled

Almost reassembled

' style=

Finished product will be installed on Monday

Finished product will be installed on Monday

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.