Attached the left flap brace, lots of drilling, some counter sinking, deburring of the brace and flap hinge. Hung the flap, installed both aileron stoppers to prevent over extnsion. Spent an hour cleaning up the shop. We have a call into the MDRA for the pre close inspection.