KitLog pro

Powered By Kitlog Pro v2.0

STEPHEN'S WEB SITE
' style=
Date:  1-28-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Riveted Doublers on all four Spars

1. Double checked location and orientation of doubler plates on spars.
2. Riveted doublers and left out rivets that are shown in instructions.
3. Left out outboard rivets on forward attatch doubler. I can not find them in the kit.(CCPQ-44)
4. Drilled out the 5/16" holes in the forward truss doubler and D-Spar.
5. It looks like the aft spar attach doubler and aft spar need to be drilled out but there is no mention of this in the instructions. I will wait on this drilling as it is easy to access later.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.