KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  11-29-2010
Number of Hours:  1.00
Manual Reference:  vert stab
Brief Description:  building the spar/rib skeleton

We prepped the edges of the 4 rib pieces (no fluting required), then cleco'd the assembly.

Note in photo 2 that I reconfigured the work benches to side-by-side....makes it easier to lay out these parts.

That's enough for tonight. Tomorrow we match drill the spar/doubler/rib holes.

A note: It seems like we didn't do much in 2 hours tonight, but I am employing a lesson I learned working horizontal stabilizer: TAKE YOUR TIME! Read the manual step, study the drawing, compare the parts, and do it again. There's lots of small detail on the drawings that the builder's manual won't make plain...you have to catch it. But by slow deliberate study, it all falls into place.

Hats off to Vans for such a great building experience. See you tomorrow!
' style=

Scotchbrite prep on the ribs

Scotchbrite prep on the ribs

' style=

ribs and spars cleco'd

ribs and spars cleco'd

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.