KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  1-17-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Continue AeroVee Engine Assembly

Continue AeroVee engine assembly.
Lube tips of push rods, insert for cylinders 1 & 2.
Install ACV-P02-10 Rhino Rocker Arm Assembly, torque nuts to 168 in/lbs.
Repeat same for cylinders 3 & 4.
Adjust valves / rocker arms for .006" clearance.
Install ACV-P01-53 Oil Change Kit, p/n 113 198 031, made in Germany.
Install oil screen and ACV-P02-20 Machined Oil Sump Plate using gaskets and copper washers from oil change kit and ACV-Z01-22 6 mm nylocks. And guess what the studs are not long enough to even engage the nuts on the threads using the machined plate.

I keep wondering if I am the first one to build this engine kit and options.

So I ended up using the cover plate from the oil change kit, but then had to grind off one side of it to clear the case.

Drill and tap ACV-P01-12 Oil Temperature Plate for 1/8"-27 NPT for the oil temperature sensor.
Install same on engine with gasket and ACV-Z01-23 x 2 nylock nuts.

Install ACV-P01-14 Fuel Pump Block Off Plate, gasket, ACV-Z01-18 x 2 Bolt. Install ACV-P01-17 Oil Filler Plug.

Install ACV-P01-11 Oil Bypass Plate & gasket using ACV-Z01-19 Bolt (M8 x 1.25). Bolts will not screw into case! Bolt is also too long.

ACV-P01-55 Maxi Oil Pump bolts x 4 (M8 x 1.25) will not screw into case !

Mask off engine, paint same, using Rust Oleum Flat Black High Temperature Paint
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.