KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  8-23-2014
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Canopy Installation

Mark D02-02 Canopy for screws through D02-04 Forward Canopy Bow, D02-06 Aft Canopy Bow.
Check spacing between canopy & bows.
Step drill 5/64", 3/32" (will eventually updrill for 8-32 tap):
D02-02 Canopy (need to updrill to 5/32")
D02-04 Forward Canopy Bow (need to tap 6-32)
D02-06 Aft Canopy Bow (need to tap 6-32)
D02-07 L & R Side Tube (1st holes drilled from inside)
D02-08 Canopy Corner
D02-15 L&R Side Trim
Cleco D02-07 & D02-08 from inside, then remove canopy.
Drill #40 & cleco D02-06 Aft Canopy Bow, D02-10 Canopy Cross Tube, D02-09 x2 Gussett (1 left, 1 right)
' style=

Canopy & Right Side Hinge Drilled, Tapped & Fasteners Installed #3638

Canopy & Right Side Hinge Drilled, Tapped & Fasteners Installed #3638

' style=

Aft Canopy Frame Drilled & Clecoed #3639

Aft Canopy Frame Drilled & Clecoed #3639

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.