Powered By Kitlog Pro v2.0
The Rosel Boys RV 8
RV-8
All
4-7-2015
< Previous Log Entry
Next Log Entry >
Date:
4-7-2015
Number of Hours:
4.00
Manual Reference:
Brief Description:
Gear leg fairings
Trimmed gear leg fairings and hinges to length. Marked hinges for rivet holes and aligned under fiberglass fairings. Dirlled and prepared hinges and fairings. Installed on legs and safety wired hinge pin
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
208
1591
Avionics
12
189
Empennage
43
209
Engine
28
298
Fuselage
79
652
Miscellaneous
10
95
Shop Supplies
2
4
Wings
34
144
Copyright © 2001-2024 Matronics. All Rights Reserved.