KitLog pro

Powered By Kitlog Pro v2.0

The Rosel Boys RV 8
Work Logs Found: 28
Category Work Time: 298 Hours
 Date
Hours
Work Log Summary

Details

 12-09-2016
10.00
Cowling: Outisde prep/paint
Details
     

 12-08-2016
10.00
Cowling paint
Details
       

 12-03-2016
16.00
Fuel pressure and quantity calibration
Details
       

 11-23-2016
3.00
Prop Torqued
Details
       

 01-22-2016
8.00
EFII Install: Firewall FWD
Details

 12-31-2015
5.00
Cowling/Baffling fit near intake
Details

 12-23-2015
6.00
Baffle Seal
Details

 12-12-2015
10.00
Airfilter bypass door/Snorkel
Details

 11-26-2015
30.00
Engine Snorkel/Baffling
Details

 11-13-2015
30.00
Engine Snorkel
Details

 10-30-2015
20.00
Engine Baffling
Details

 10-16-2015
16.00
Engine Baffling
Details

 07-04-2015
4.00
Engine Probes
Details
       

 06-28-2015
12.00
Cowling Prop Temp Install
Details

 06-22-2015
20.00
EFII Install: Solenoids
Details
     

 06-19-2015
15.00
Battery Boxes
Details
     

 06-13-2015
15.00
Exhaust
Details
       

 06-12-2015
5.00
Baffling
Details

 06-04-2015
8.00
EFII
Details
       

 05-31-2015
7.00
Throttle body bracket
Details
       

 05-24-2015
15.00
Prop Gov/Alternator/EFII
Details
       

 05-12-2015
5.00
Sender Mount
Details

 05-07-2015
10.00
Firewall Fwd Install
Details
       

 05-07-2015
0.00
Engine Mount (more pics)
       

 02-26-2015
8.00
Titan Engine: Dyno Test
       

 02-25-2015
0.00
Titan Engine: More pics
       

 02-25-2015
8.00
Titan Engine Assembly
Details
       

 08-23-2014
2.00
Titan Engine
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.