KitLog pro

Powered By Kitlog Pro v2.0

The Rosel Boys RV 8
' style=
Date:  11-10-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Elevator: Check alignment and adjust

We connected both elevators and trim tab to the horz stabilizer and checked for alignment. We shut down to call Van's to confirm we had everything in alignment properly before final dirlling the control horns.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.