KitLog pro

Powered By Kitlog Pro v2.0

The Rosel Boys RV 8
' style=
Date:  8-18-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Priming Horz Stab

Etched, conditioned, and primed all parts on hortizontal stabilizer.

Steps

1.) Clean with PPG aluminum cleaner (DX533) using red scotchbrite. Apply heavy and rinse with fresh water, let dry

2.) Apply conditioner (DX503) using soft rag. Heavy coating. Let set for 3-5 minutes and rinse with water. Let dry. Be sure to use good rubber gloves!

3.) Prime with (SEM Self Etching Primer 39693 Green)
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.