Powered By Kitlog Pro v2.0
The Rosel Boys RV 8
RV-8
All
7-6-2013
< Previous Log Entry
Next Log Entry >
Date:
7-6-2013
Number of Hours:
6.00
Manual Reference:
Brief Description:
Front spar assembly
Major work done was to bend both pieces for the front spar assembly. Found a great builder log...http://myrv8.blogspot.com
Front spar assembly-post bend
Bended pieces of front spar
George preparing to hammer the 6 degree in HS814
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
208
1591
Avionics
12
189
Empennage
43
209
Engine
28
298
Fuselage
79
652
Miscellaneous
10
95
Shop Supplies
2
4
Wings
34
144
Copyright © 2001-2024 Matronics. All Rights Reserved.