...Getting gearbox changeover complete....Hoisted each side of engine and got alignment correct for lower engine mount bushings. Reinstalled ET sensor on bottom of coolant thermostat housing, radiators and air shrouds. Reinstalled starter and wires/cables/sensors. Reinstalled oil cooler. Added 11/4 gals of NPG+ to coolant system. Reconnected neg. batt. terminals. Checked all connections and terminals and started the engine. She sounded great as does the new gearbox!