KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  10-6-2012
Number of Hours:  1.10
Manual Reference:  10-16.4.5.7.8
Brief Description:  Dimple Tailcone Bulkheads, Frames

1900 - 2006

Dimple tailcone bulkheads and frames.

Dimple tailcone stiffeners.

Final drill battery channels per plans.

Final drill elevator bellcrank mount per plans using #40, #30, #12 drills.

Machine countersink bellcrank mount holes per plans.

Debur all holes.

Fabricate larger shim for elevator bellcrank for autopilot servo linkage. Not sure if I will use it, a washer may be adequate but it was a good time to fabricate it.

Final drill all 1/8" holes in bellcrank using #30 drill, cleco after drilling.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.