KitLog pro

Powered By Kitlog Pro v2.0

Rob and Haruko RV-12 N73HR
' style=
Date:  1-3-2011
Number of Hours:  5.00
Manual Reference:  28-06,-08,30-02,31
Brief Description:  Completed fuel system, began wing attach & electri

Completed 1/4" fuel return line fabrication and installation. As noted in the fora, I should have dome some of this--the thru-bulkhead connector in particular, earlier than the descructions direct. Had to find a set of crow's foot wrenches to complete installation.
Assembled Fuselage/Wing pin assemlby(Section 29-02) but will not do trial fitting of wings until some help is available. Starting assembling the wing electrical connector UHMW blocks.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.