Brief Description: Completed drilling for wing tip lights, move left
I finished sanding the left wingtip nave/strobe liht fiberglass faring and match hole drilled most of the attachement holes. I postponed completing the fiberglass (flock & resin) work on the nav/strobe farings, along with the pro-sealing and final electrical hookup--will finish up later, when I have some fresh resin & pro-seal for the fuse and finish kit.
Aside from the work left to do on the nav/strobe, the left wing is complete--moved it to the recently-constructed wing stand.