KitLog pro

Powered By Kitlog Pro v2.0

Dick's Web site
' style=
Date:  7-12-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Inspector Bob arrives

I realized the the Forward clip had not been Clecoed to the spline, so the first thing was to drill those holes. Now the entire Turtle Deck was drilled to size and clecoed. Inspector Bob arrived after lunch. Then I started to disassemble the Turtle deck structure. Clecos were removed from the formers and the splices. The splices and Forwad clip were deburred after removal from the structure. The #1 and #2 Left side formers were removed and deburred. The right side formers will be deburred tomorrow when it cools down.
' style=

Forward Clip drilled to size

Forward Clip drilled to size

' style=

Inpector Bob arrives

Inpector Bob arrives

' style=

Started deburring

Started deburring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.