After a 10 mile ride along Huntington beach it's cooled off a little. The #2 Former was installled and Clecoed in place. The Formers were drilled and Clecoed to the vertcal channels. All holes have been drilled to final size. Some problems getting ti some drill locations but the job got done. Aft Fuselage ready to disassemble and deburr all holes. Splice plates on the #1 Former were drilled to final size.