Powered By Kitlog Pro v2.0
Western-Outbound
S-21 Outbound
All
12-11-2018
< Previous Log Entry
Next Log Entry >
Date:
12-11-2018
Number of Hours:
0.50
Manual Reference:
Section 4
Brief Description:
Horizontal Stabiliser Started
Found and layed out the parts for the horizotal stabiliser frame as per the parts manual. next will be to flute the ribs and do a rough assembly.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Starlet CJ-1 Home
S-21 Outbound Home
Category
# Logs
# Hours
All
28
47
Elevator
3
8
Horizontal Stabilise
10
16
Inspection
1
Inventory
2
12
Miscellaneous
1
Rudder
4
3
Vertical Stabilizer
7
8
Copyright © 2001-2024 Matronics. All Rights Reserved.