KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-29-2012
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Brakes

Derek 6.0 Phil 6.0

JJ and Susi came by to check on our progress today. We got his help starting to make wiring connections and crimps for the wing tips

Spent most of the day working on the brake system. Drilled out the center of the pully to insert a sintered bushing. Attached that to the brake handle and routed the brake cables through fuselage and along the aft side of the landing gear legs.

Will hook up brakes after we pack wheel bearings with grease.
' style=

Inserted the Azusa cable retainers

Inserted the Azusa cable retainers

' style=

Routed the cables down through the floor to their respective gear legs

Routed the cables down through the floor to their respective gear legs

' style=

Used 3 metal cable retainers to secure cables to gear legs

Used 3 metal cable retainers to secure cables to gear legs

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.