JJ and Susi came by to check on our progress today. We got his help starting to make wiring connections and crimps for the wing tips
Spent most of the day working on the brake system. Drilled out the center of the pully to insert a sintered bushing. Attached that to the brake handle and routed the brake cables through fuselage and along the aft side of the landing gear legs.
Will hook up brakes after we pack wheel bearings with grease.
Inserted the Azusa cable retainers
Routed the cables down through the floor to their respective gear legs
Used 3 metal cable retainers to secure cables to gear legs