Brief Description: Finished Left Brake. Packed Wheel Bearings
Derek 3.0 Phil 3.0
Mother's day. Derek out of town most of the weekend. Got a little done late Sunday evening. Finished brake installation by attaching left brake cable guide block with flush head screws.
Packed bearing with grease and installed wheels on gear. Had to open cotter pin holes to 1/8" for cotter pins to fit.
Started to pre-assemble to canopy frame. Probably need David Clay's guidance so we will wait to start on that until next time.