Brief Description: Assemble skeleton and prepare elevator for priming
Alumipreped elevator skin, stiffeners and trim plate. While the parts were air drying after rinsing with water, I started assembly of skeleton beginning with the two CB ribs and skin. The CB weight is installed between the ribs and skin then I clecoed the assembly together. As the skin is clecoed, the skin is stretched tight around the lead weight and at this point it is impossible to remove it from the assembly.
Clecoeing the CB ribs and skin
Priming the elevator skin - notice there is no overspray
Dimpling station - I look like I'm about to fall asleep but trust me I'm awake