KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  10-18-2020
Number of Hours:  1.00
Manual Reference:  9225501-LOG-15.017
Brief Description:  Map Box Lining

Not much happening in the workshop today. I had Rotary Club duties this morning, plus Bathurst was on this afternoon. I did duck off to the hangar for a little while, and fitted some tough felt-like drawer liner material to the inside of the mapbox. To make the liner fit properly I used a hole punch to punch out holes where the rivet heads protrude through. I then used contact adhesive to glue pieces in place on the sides and the bottom.

It came out quite neat.
' style=

The mapbox now has a tough felt liner

The mapbox now has a tough felt liner

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.