KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  6-24-2018
Number of Hours:  1.50
Manual Reference:  9225501-LOG-11.004
Brief Description:  3: Instrument Panel Map Box

With the sub-panel cut out done, I then turned my attention to the corresponding hole in the instrument panel. Again, I carefully marked out the hole as per the drawings and then, using the supplied "Drill Jig", I match drilled all the rivet holes and the corner holes for the cut-out.

My dremel got a second workout today when I put it to the task of cutting out the hole. This is quite a "nervy" task as one slip and I could easily damage my panel for good, so with steady hand and intent focus I proceeded very slowly.

The hole came out very neat and didn't take much with the file and scotchbrite pad to clean it up perfectly. I say perfectly, because when I put the whole assembly back together again the map box aligned oh so neat.

I think I'll finish this off next weekend.
' style=

Using the supplied Drill Jig to match drill the map box holes

Using the supplied Drill Jig to match drill the map box holes

' style=

Cleaning up the hole with a file. Slowly slowly is the order of the day here

Cleaning up the hole with a file. Slowly slowly is the order of the day here

' style=

Map box clecoed in place

Map box clecoed in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.