KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  5-27-2018
Number of Hours:  1.50
Manual Reference:  9225501-LOG-03.105
Brief Description:  1: Building the Empennage

I drifted around between several different jobs today, but by far the most satisfying was building the empennage. I bolted the horizontal stabiliser in place and verified that it was still perpendicular to the longitudinal axis.........spot on!

I then got the vertical stabiliser out of storage. I had to trim a little piece out of the flange of the forward spar, down at the bottom, as per the drawings. Not sure why the instructions didn't call for this when building it. Oh well, done now. After touching up the exposed metal with some primer I then clamped the vertical stabiliser in place.

Yeah, this looks awesome!
' style=

Horizontal stabiliser bolted in place

Horizontal stabiliser bolted in place

' style=

Vertical stabiliser clamped in position

Vertical stabiliser clamped in position

' style=

This looks awesome

This looks awesome

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.