KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  3-29-2022
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Hangar Extension is Started

I realised that my hangar needs a bit more space, so some time ago I sought Council approval to build a store room extension onto the main hanger. Today works started.
' style=

Prep work for the concrete slab

Prep work for the concrete slab

' style=

3m wide by about 6m long, witgh a 2m porch at the airside end

3m wide by about 6m long, witgh a 2m porch at the airside end

' style=

This space will soon be filled with more steel and colorbond

This space will soon be filled with more steel and colorbond

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.