I continued today with the canopy side skirts, and finished off the left side by dimpling and countersinking those holes that required dimpling or countersinking. The holes in the perspex canopy bubble also needed to be drilled slightly over size, to prevent stress cracking. I did this as well, albeit very, very carefully.
Also today I decided to reassemble the sliding canopy extension rails. These work really well, and allow so much more access into the baggage area. A good Oshkosh 2017 buy indeed :-).
Lastly today I got a start on the right side skirt. Not much to show, but some very good progress nonetheless.
The side skirt brace, with lightening holes drilled
Starting on the right side skirt
Supertracks canopy extension parts are reinstalled