KitLog pro

Powered By Kitlog Pro v2.0

Pete's RV-8 Web Site
' style=
Date:  8-25-2008
Number of Hours:  2.00
Manual Reference:  6-2
Brief Description:  Initial assembly of left horiz stab

Identified and marked the ribs to be used on the left and right of the horiz stab.

Using the dimensions given in Sec D-D (DW3), marked hole locations on the forward flange of HS-405 (these holes attach HS-405 to the forward spar assembly and HS-404) and drilled pilot holes to #40. Care taken to ensure proper edge distance on HS-405.

Selected the left side HS-702, HS-603PP, HS-706, HS-707 and HS-708 and clecoed together.

Drilled all rib to spar attach holes to #30 (except the HS-708 to HS-603PP holes). Removed clecos, deburred, cleaned out any chips and reclecoed.

Attached the left horiz stab skin (HS-801PP) with clecos.
' style=

Left Horizontal Stab

Left Horizontal Stab

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.