KitLog pro

Powered By Kitlog Pro v2.0

Pete's RV-8 Web Site
' style=
Date:  2-2-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Continued work on port side aft baffle

Fabricated a doubler to reinforce the entire rear baffle where the cooler will attach. The baffle and the doubler plate were cut for the cooler and match drilled. The heavy spacer for the outboard flange was fabricated and everything was clecoed together for test fitting.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.