KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  10-28-2016
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Tire and Brakes

Assembled the Tires and brakes and mounted them to the Axles.

The innertubes were coated with baby powder to allow them to slip inside the tires and to make sure they did not fold over and create folds during inflation.

I downloaed the installation instrutions for this wheel assy from MATCO wheels to ensure the valve stem is installed correctly since it goes through the center of the 2 piece Wheel.

Pushed the fuse fwd and Aft on the ground.. ops check good
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.