KitLog pro

Powered By Kitlog Pro v2.0

Matts Build Log
' style=
Date:  3-15-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Elevator Rods

The elevator push rods have fully dried and now are ready for install. Reviewing the plans, the rod ends were installed withing 164 of an inch tollerance. Once they were set, the back-up nuts were "Red" Loc-tite secured. All of the hardware was secured so I can set up the Max travel stops in the back.


Once the hardware was set and the push-rods were set, I was able to setup drilling the hold for the elevator control horns. Tlhe elevators are clamped in place So I can set up the pushrod Length.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.