Got the Fuse opened back up and setup on the table in she shop. I grabbed some spare Ply and match drilled the engine mount holes to mount it to the firewall. Then mounted the engine stand to the ply and then to the stand.
I used 2 furniture dollies as the bases of the rolling assembly so it can move in all directions.
The tail is a crude stand that will hold the end up so that the fuse is Fligh Level.