Powered By Kitlog Pro v2.0
Nate's RV-7 Site
RV-7
Wings
3-16-2021
< Previous Log Entry
Next Log Entry >
Date:
3-16-2021
Number of Hours:
2.00
Manual Reference:
Sect 7-9
Brief Description:
Match Drilling Aileron Brackets and Gap Fairing
In this work session I mated and match drilled the left and right wing aileron brackets and the left and right wing aileron gap fairings.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
RV-7 Home
RV-7 Home
Category
# Logs
# Hours
All
409
1851
Empennage
113
412
Fuel Tanks
65
360
Fuselage
58
247
Miscellaneous
8
12
None
2
4
Wings
163
816
Copyright © 2001-2024 Matronics. All Rights Reserved.