Powered By Kitlog Pro v2.0
DAVID'S WEB SITE
Evolution
All
4-7-2016
< Previous Log Entry
Next Log Entry >
Date:
4-7-2016
Number of Hours:
2.00
Manual Reference:
21.2.F.8
Brief Description:
NOSE DOOR GAS STRUT
THE FOLLOWING IS DONE AFTER THE NOSE GER HAS BEEN ALIGNED AND BOLTED TO THE ENGINE MOUNT.
1 Install the ball stud into thr bracket.
2 Install the ball tud to the nose gear.
3 Attach the gas strut to the ball stud in the bracket.
4 Insert the gas strutinto the tunnel bove te gear door open/closer ad the upstop brace.
5 Fully extend the nose gear. With the gas strut fully extended hold the tip with the rod end apporx 1 inch past the ball stud.
6 Locate the position of the gas strut attachment in the tummel. Match drill the bracket to the tunnel.
7 Bolt the brackets to the tunnel
8 Attach the gas strut to the ballstuds on the nose gear and on the bracket i the tunnel.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Evolution Home
Category
# Logs
# Hours
All
227
1207
10 fuselage
14
113
11 hyd sys
19
125
12 fuel sys
8
42
13 brake sys
9
34
14 seat/saet belts
11
41
15 main door
12
23
16 heat/vent/air con
11
56
17 baggage door
8
38
18 pitot static
1
8
19 elec and avionics
14
57
20 auto pilot
4
22
21 nose gear
14
68
3 horizontal stab /
19
232
31 ice rain protecti
10
73
4 rudder
16
62
5 wings
20
90
6 flaps
5
7
7 aileron
11
50
8 landing gear
12
37
9 gear doors
4
25
duplicate inspection
1
4
Shop Supplies
4
Copyright © 2001-2024 Matronics. All Rights Reserved.