KitLog pro

Powered By Kitlog Pro v2.0

DONALD'S WEB SITE
' style=
Date:  8-25-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drilling & Laying Out Elevators

Finished drilling the right elevator outer two ribs, and drilled the underside root ribs of both elevators. I still need to do the top side, but I need to lay it out someplace level that will allow the underside clecos to remain in place so nothing shifts. I'll worry about that next time.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.