KitLog pro

Powered By Kitlog Pro v2.0

DONALD'S WEB SITE
' style=
Date:  4-2-2011
Number of Hours:  4.00
Manual Reference:  SNX-F25
Brief Description:  Aft Fuselage Fairlead Guides and Updrilling

I attached the phenolic blocks with fairlead guides to the forward and aft vertical channels (didn't do remaining guides yet, because the Wick's hardware kit did not include them...will have to order).

Also updrilled longerons, channels, and skins. I screwed up by not reading the plans closely enough, and updrilled the upper longeron/skins, which I was not supposed to do until the turtle deck skins are fitted. It remains to be seen how much of a problem this will be, though I should be able to updrill to 5/32" holes and use CCP-54 rivets instead of CCP-44s in the worst case. So, not a disaster.
' style=

Phenolic Block Attach Example

Phenolic Block Attach Example

' style=

One Side Updrilled

One Side Updrilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.