KitLog pro

Powered By Kitlog Pro v2.0

MIKE'S WEB SITE
' style=
Date:  7-23-2020
Number of Hours:  2.00
Manual Reference:  9-25
Brief Description:  Rolled leading edge of right elevator

I rolled the leading edge of the right elevator today. I used a slightly larger diameter pipe to see if it would make it easier to match up both sides. It didn't make much difference in my opinion. Once they were rolled I riveted them together with the pop rivets but since I had to drill out so many on the left elevator I didn't have enought to finish the right side. I ordered more from Van's along with some K1100-06 nutplates that I'll need for the flush mounted access panels in Ch 10.
' style=

Right elevator rolled and riveted

Right elevator rolled and riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.