KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  7-12-2013
Number of Hours:  4.00
Manual Reference:  8-10
Brief Description:  Canopy side rail work.

Tonight, I clecoed, countersunk, and riveted the F-721B side rails, F-757 gussets, F-721A canopy decks to the F-718 longerons. I used masking tape to protect the parts and it turned out really sharp. The blue anodized surfaces look really good and should last a long time.

I will need to borrow some small flush pulled rivets from Gerry for the two rivets that connect the F-721B's to F-721A's.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.