KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  7-25-2007
Number of Hours:  2.50
Manual Reference:  6-3
Brief Description:  Drilled rib flange holes to spar and match drilled

Tonight I made some really good progress. I match drilled HS-405 and 404 to the front spar. I used Gerry's angle drill as this was a tight spot. I couldn't get the holes perfectly square to the spar due to the 3/8" chuck on the angle drill, but it will work out fine.

The rest of the time was spent drilling all of the skin holes to number 40 size. The boys and I are heading to Oshkosh Airventure Thursday night after football practice so I won't be working for a few days.
' style=

Match drilled all holes in skin and clecoed in place.

Match drilled all holes in skin and clecoed in place.

' style=

Laid hoizontal stab down while at Oshkosh.

Laid hoizontal stab down while at Oshkosh.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.