KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  1-7-2008
Number of Hours:  5.00
Manual Reference:  Riveting HS
Brief Description:  Riveting the Vertial Stabilizer

Finished riveting HS with exception of the rear spar. Will wait for the elevator to locate nut plates for the Static Discharge System.

Started to rivet the rear spar for the Vertical Stabilizer (VS). Realized that I did not dimple all the required holes, but was able to use the DRDT-1A Dimpling Tool to solve the problem
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.