Brief Description: continued work on empennage components
installed temporary cross-bracing on the internal skeleton of the horizontal stabilizer to keep it rigid while drilling the holes for the mounting bolts. Made up the hinges for the elevators and the elevator trim tab. Installed the reinforcing angles for mounting the anchor nuts for the horizontal stabilizer mounting bolts.