First rivets are in. Bearing looks good. Of note, the bearing is not perfectly centered on the bracket that was drilled. I checked on the VAF forums and this is apparently normal.
Also the notes in section 5 and the plans address the length of the rivet call-out. In this case a -5 is used, but when you squeeze them to the correct height, the head does not meet the spec. If you squeeze any further, the height will be way below limits but the plans say no problem for this application. The brackets are just holding the bearing in place. So just get them to the correct height.